BELICHE DAM

PURPOSE - Water supply / Irrigation
LOCATION GENERAL FEATURES
District - Faro
Municipality - Castro Marim
Site - Beliche
River Basin - Guadiana
River - Beliche river
Promoting entity - INAG
Owner (RSB) - INAG
Engineering by - Hidroprojecto
Construction by - A. Supico
Project year - 1979
Year of completion - 1986
HYDROLOGY RESERVOIR
River basin area - 117 km2
Mean annual rainfall - 778 mm
Flood runoff - 456 m3/s
Return period - 1000 years
Reservoir area - 2920 x 1000m2
Gross capacity - 48000 x 1000m3
Effective storage - 47600 x 1000m3
Dead storage - 400 x 1000m3
Normal water level (NWL) - 52 m
Maximum flood level (MFL) - 53,94 m
Minimum operating level - 27 m
DAM
Fill - Rockfill with clay core
Height above foundation - 54 m
Height above streambed - 42 m
Crest elevation - 54,3 m
Crest length - 527 m
Crest width - 12 m
Foundation - Schist and greywacke
Volume of dam body - 991 x 1000 m3
SPILLWAY BOTTOM OUTLET
Location - Left bank
Control type - Controlled
Spillway type - Chute spillway
Sill elevation - 48,5 m
Sill length - 2 x 5 m
Number of gates - 2 radial gates
Maximum discharge - 267 m3/s
Energy dissipation - Hydraulic jump
Location - Left bank
Type - Rock tunnel
Section - d 3,5 m
Maximum discharge - 68 m3/s
Upstream control - Sluice gate
Energy dissipation - Hydraulic jump