CAROUCHA DAM

PURPOSE - Irrigation
LOCATION GENERAL FEATURES
District - Faro
Municipality - Castro Marim
Site - Junqueira
River Basin - Guadiana
River - Caroucha river
Promoting entity - Direcção Regional de Agricultura do Algarve
Owner (RSB) -
Engineering by - Eng. Isaurindo de Oliveira e Engº João Fonseca
Construction by - Dolmen, Varino e Filho e IEC
Project year - 1994
Year of completion - 1999
HYDROLOGY RESERVOIR
River basin area - 6,8 km2
Mean annual rainfall - 526,5 mm
Flood runoff - 68,9 m3/s
Return period - 500 years
Reservoir area - 120 x 1000m2
Gross capacity - 600 x 1000m3
Effective storage - 550 x 1000m3
Dead storage - 50 x 1000m3
Normal water level (NWL) - 31,6 m
Maximum flood level (MFL) - 32,6 m
DAM
Earthfill - Homogeneous embankment
Height above foundation - 16,5 m
Height above streambed - 15,8 m
Crest elevation - 33,72 m
Crest length - 137,5 m
Crest width - 6,5 m
Volume of dam body - 44 x 1000 m3
SPILLWAY BOTTOM OUTLET
Location - Saddle at left embankment
Control type - Uncontrolled
Spillway type - Chute spillway
Sill elevation - 31,6 m
Sill length - 25 m
Maximum discharge - 53,93 m3/s
Energy dissipation - Hydraulic jump
Location - Right bank
Type - Conduit under the embankment
Section - d 700 mm
Maximum discharge - 2,11 m3/s
Upstream control - Comporta mural
Downstream control - Válvula de cunha
Energy dissipation - Impact basin


ARROWA.GIF (181 bytes)            homeicona.gif (359 bytes)