MIRANDA DAM

PURPOSE  - Hydroelectric
LOCATION GENERAL FEATURES
District - Bragança
Municipality - Miranda do Douro
Site - Miranda do Douro
River Basin - Douro
River - Douro river
Promoting entity - CPPE, Cª. Portuguesa de Produção de Electricidade, SA
Owner - CPPE
Engineering by - Hidro Eléctrica do Douro
Construction by - ETELI
Project year - 1955
Year of completion - 1961
HYDROLOGY RESERVOIR
River basin area - 63100 km2
Mean annual rainfall - 577 mm
Mean annual runoff - 3453 x 1000 m3
Flood runoff  - 11 000 m3/s
Return period  -
1000 years
Reservoir area   - 1220 x 1000m2
Gross capacity - 28100 x 1000m3
Effective storage - 6660 x 1000m3
Normal water level (NWL) - 528,05 m
Maximum flood level (MFL) - 533 m
DAM
Type - Concrete, buttress dam
Height above foundation - 80 m
Height above streambed -
Crest elevation - 535 m
Crest length - 263 m
Foundation - Schist and granite
Volume of dam body
- 240 x 1000 m3
SPILLWAY BOTTOM OUTLET
Location - Dam body
Control type - Controlled
Spillway type - Over the dam
Sill elevation - 520 m
Sill length -
4 x 24=96 m
Number of gates - 4 radial gates
Maximum discharge -
11 000 m3/s
Energy dissipation - Stilling basin
Location - Thalweg
Type - Through the dam
Section - 2,5 m
Upstream control  - No
Downstream control - yes
Energy dissipation - Stilling basin
POWER PLANT
Type - Underground run-of-river power station
Number of installed units - 4
Type of units - Francis
Power installed capacity - 390 MW
Mean annual energy output - 1036,3 GWh