ODIVELAS DAM

PURPOSE - Irrigation
LOCATION GENERAL FEATURES
District - Beja
Municipality - Ferreira do Alentejo
Site - Odivelas
River Basin - Sado
River - Odivelas river
Promoting entity - INAG
Owner- Associação de Beneficiários da Obra de Odivelas
Engineering by - DGSH
Construction by - ZAGOPE
Project year - 1967
Year of completion - 1972
HYDROLOGY RESERVOIR
River basin area - 430 km2
Mean annual rainfall - 640 mm
Mean annual runoff - 80 800 x 1 000 m3
Flood runoff  - 1100 m3/s
Return period  -
100 years
Reservoir area - 9 730 x 1 000m2
Gross capacity - 96 000 x 1 000m3
Effective storage - 70 000 x 1 000m3
Dead storage - 26 000 x 1 000m3
Normal water level (NWL) - 103 m
Maximum flood level (MFL) - 104,55 m
Minimum operating level  - 91,3 m
DAM
Earthfill - Homogeneous embankment
Concrete - Multi-arch dam
Composite dam - Yes
Height above foundation - 55 m
Height above streambed - 48 m
Crest elevation - 106 m
Crest length - 544 m
Crest width - 7,5 m
Foundation -
Schist (doleritos)
Volume of Earthfill - 86 x 1 000 m3
Volume of Concrete -
97 x 1 000 m3
SPILLWAY BOTTOM OUTLET
Location - Center
Control type - Controlled
Spillway type - Over the dam
Sill elevation - 97,5 m
Sill length -
2 x 10 m
Number of gates - 2 radial gates
Maximum discharge -
650 m3/s
Energy dissipation - Flip bucket
Location - Thalweg
Type - Through the dam
Section - d 2,0 m
Maximum discharge  - 50 m3/s
Upstream control - Fixed roller gate
Downstream control - Hollow jet valve
Energy dissipation - Hollow jet and scour holes


ARROWA.GIF (181 bytes)            homeicona.gif (359 bytes)