PÓVOA DAM

PURPOSE - Hydroelectric
LOCATION GENERAL FEATURES
District - Portalegre
Municipality - Castelo de Vide
Site - Póvoa e Meadas
River Basin - Tejo
River - Nisa river
Promoting entity - HIDROTEJO, Hidroeléctrica do Tejo, SA
Owner - HIDROTEJO
Engineering by - Hidro Eléctrica Alto Alentejo
Construction by - Hidro Eléctrica Alto Alentejo
Project year - 1925
Year of completion - 1928
HYDROLOGY RESERVOIR
Flood runoff   - 250 m3/s Reservoir area - 2 360 x 1 000m2
Gross capacity - 22 000 x 1 000m3
Effective storage - 18 800 x 1 000m3
Normal water level (NWL) - 312 m
Maximum flood level (MFL) - 313 m
DAM
Concrete - Gravity
Height above foundation - 32 m
Height above streambed - 28,5 m
Crest elevation - 313,5 m
Crest length - 400 m
Foundation - Granite
Volume of dam body
- 32 x 1 000 m3
SPILLWAY BOTTOM OUTLET
Location - Left bank
Control type - Uncontrolled
Spillway type - Chute spillway
Sill elevation - 309,85 m
Maximum discharge -
110 m3/s
Location - Thalweg
Type - Through the dam
Upstream control - Gate
Downstream control - Hollow jet
Energy dissipation - Hollow jet and scour holes
POWER PLANT
Type - Outdoor
Number of installed units - 2
Type of units - Francis
Power installed capacity - 0,74 MW
Mean annual energy output - 1,6 GWh