ALIJÓ DAM

PURPOSE - Water supply
LOCATION GENERAL FEATURES
District - Vila Real
Municipality -
Alijó
Site -
Vila Chã
River Basin - Douro
River -
Chã river
Promoting entity - INAG
Owner (RSB) - INAG
Engineering by - Hidrotécnica Portuguesa
Construction by - CPTP
Project year - 1985
Year of completion - 1991
HYDROLOGY  RESERVOIR
River basin area - 9 km2
Mean annual rainfall - 900 mm
Mean annual runoff - 2920 x 1000 m3
Flood runoff - 72 m3/s
Return period - 1000 years
Reservoir area - 180 x 1000m2
Gross capacity - 1740 x 1000m3
Effective storage - 1590 x 1000m3
Dead storage - 150 x 1000m3
Normal water level (NWL) - 658,5 m
Maximum flood level (MFL) - 659,9 m
Minimum operating level - 640 m
DAM
Earthfill - Zoned embankment
Height above foundation - 40 m
Height above streambed - 36 m
Crest elevation - 660,9 m
Crest length - 167 m
Crest width - 6 m
Foundation - Weathered granite
Volume of dam body - 352,4 x 1000 m3

SPILLWAY BOTTOM OUTLET
Location - Left bank
Control type - Uncontrolled
Spillway type - Chute spillway
Sill elevation - 658,5 m
Sill length - 20,9 m
Maximum discharge -
52 m3/s
Energy dissipation - Flip bucket
Location - Left bank
Type - Conduit under the embankment
Section - 1,0 m
Maximum discharge - 2,5 m3/s
Upstream control - Sluice gate
Downstream control - Howell-Bunger valve
Energy dissipation - Hollow jet and scour hole


ARROWA.GIF (181 bytes)            homeicona.gif (359 bytes)