ALTO CÁVADO DAM

PURPOSE - Power production / Diversion
LOCATION GENERAL FEATURES
District - Vila Real
Municipality - Montalegre
Site - Sezelha
River Basin - Cávado
River - Cávado river
Promoting entity - CPPE
Owner (RSB) - CPPE
Engineering by - Hidro-Eléctrica do Cávado
Construction by - MAGOP
Year of completion - 1964
HYDROLOGY RESERVOIR
River basin area - 102 km2 Reservoir area - 500 x 1000m2
Gross capacity - 3300 x 1000m3
Effective storage - 2000 x 1000m3
Dead storage - 1300 x 1000m3
Normal water level (NWL) - 901,5 m
Maximum flood level (MFL) - 905 m
DAM
Concrete - Gravity dam
Height above foundation - 29 m
Height above streambed - 26 m
Crest elevation - 906,5 m
Crest length - 220 m
Crest width - 4,74 m
Foundation - Rock
Volume of dam body - 29 x 1000 m3


SPILLWAY BOTTOM OUTLET
Location - Dam body
Control type - Uncontrolled
Spillway type - Over the dam
Sill elevation - 901,5 m
Maximum discharge - 410 m3/s
Energy dissipation - Hydraulic jump
Location - Thalweg
Type - Through the dam
Section - d 1,65 m
Maximum discharge - 27 m3/s
Downstream control - Yes