CABRIL DAM

PURPOSE - Hydroelectric
LOCATION GENERAL FEATURES
District - Castelo Branco
Municipality - Sertã
Site - Cabril
River Basin - Tejo
River - Zêzere river
Promoting entity - CPPE, Cª. Portuguesa de Produção de Electricidade, SA
Owner (RSB) - CPPE
Engineering by - Hidroeléctrica do Zêzere
Construction by - Moniz da Maia & Vaz Guedes
Project year - 1950
Year of completion - 1954
HYDROLOGY RESERVOIR
River basin area - 2340 km2
Mean annual rainfall - 1300 mm
Mean annual runoff - 1577000 x 1000 m3
Flood runoff - 4000 m3/s
Return period - 1000 years
Reservoir area - 20230 x 1000m2
Gross capacity - 720000 x 1000m3
Effective storage - 615000 x 1000m3
Normal water level (NWL) - 294 m
Maximum flood level (MFL) - 296,3 m
DAM
Concrete - Double curvature arch dam
Height above foundation - 132 m
Crest elevation - 297 m
Crest length - 290 m
Foundation - Granite
Volume of dam body - 360 x 1000 m3
SPILLWAY BOTTOM OUTLET
Location - On both banks
Control type - Controlled
Spillway type - Shaft spillway
Sill elevation - 278 m
Number of gates - 2 stoney
Maximum discharge - 2200 m3/s
Energy dissipation - Hollow jet and scour hole
Location - Thalweg
Type - Through the dam
Section - 3 m
Maximum discharge - 200 m3/s
Downstream control - Howell-Bunger valve
Energy dissipation - Hollow jet and scour hole
POWER PLANT
Type - Dam toe
Number of installed units - 2
Type of units - Vertical axis
Power installed capacity - 97 MW
Mean annual energy output - 301 GWh