ZAMBUJO DAM

PURPOSE - Water supply
LOCATION GENERAL FEATURES
District  - Portalegre
Municipality - Alter do Chão
Site - Marinheira
River Basin- Tejo
River - Zambujo river
Promoting entity - C. M. Alter do Chão
Owner (RSB) - C. M. Alter do Chão
Engineering by - J. M. Reboredo Pinto Leite
Construction by - C M Alter do Chão / Mendes, Transportes e Construções, S.A
Project year - 1989
Year of completion - 1994
HYDROLOGY RESERVOIR
River basin area - 13,6 km2
Mean annual rainfall - 629,3 mm
Reservoir area - 370 x 1 000 m2
Gross capacity - 1 250 x 1 000 m3
Effective storage - 1 229 x 1 000 m3
Dead storage - 21 x 1 000 m3
Normal water level (NWL) - 197,2 m
Maximum flood level (MFL) - 197,92 m
Minimum operating level  - 190 m
DAM
Earthfill - Homogeneous embankment
Height above foundation -
 24 m
Height above streambed - 12 m
Crest elevation - 199 m
Crest length - 209,5 m
Crest width - 4 m
Volume of dam body
73,2 x 1 000 m3
SPILLWAY BOTTOM OUTLET
Location - Left bank
Control type - Uncontrolled
Spillway type - Chute spillway
Sill elevation - 197,2 m
Sill length -
10 m
Maximum discharge - 13,25 m3/s
Energy dissipation - Hydraulic jump
Type - Conduit under the embankment
Section - d 700 mm
Maximum discharge - 1,75 m3/s
Upstream control - Sluice gate